Title:
|
ORD Confirm the Mayor’s Appt of James Carroll as Chief of the Right of Way & Stormwater Maintenance Div of the Dept of Public Works of the COJ Pursuant to Sec 32.302, Ord Code; Waiving the Requirements of Sec 32.202, Ord Code, that the Div Chief have a 4-Yr Degree from an Accredited College or University in Engineering, Construction or Construction Management & be Registered by the State of FL as a Professional Engineer; Req 1 Cycle Emergency Passage (Staffopoulos) (Introduced by CP at Req of Mayor)
6/14/22 CO Introduced: R
6/22/22 R Emergency/Approve 6-0
6/28/22 CO PH Emergency/Approve 18-0
Public Hearing Pursuant to Chapt 166, F.S. & C.R. 3.601- 6/28/22
|