Title:
|
ORD Approp $2,096,681.71, Including $1,110,573.00 from the Countywide Traffic Signalization - Fiber Optic Proj, $700,000.00 from the Countywide Intersection Improvements Proj, & $286,108.71 from the Countywide Rdwy Sign Stripe & Signal Proj, to Various Projs Including: (1) $150,325.50 to the Monument Rd Pedestrian Crossing Proj; (2) $135,783.21 to the St. Johns Bluff Rd & Lost Pine Dr Signalized U-Turn Proj; (3) $350,000.00 to the Golfair Blvd & APR Academy Pedestrian Crossing Proj; (4) $350,000.00 to the Overhead Pedestrian Signal - Soutel Dr at Morris Manor Proj; (5) $634,863.00 to the Fort Caroline Rd Fiber Optic Proj; & (6) $475,710.00 to the St. Augustine Rd Fiber Optic Proj; Amend the 26-30 5-Yr CIP Appvd by Ord 2025-505-E to Reflect this Approp of Funds to the Proj (B.T. 26-029) (Dillard) (Req of Mayor)
1/13/26 CO Introduced: NCSPHS, TEU, F
Public Hearing Pursuant to Ch 166, F.S. & CR 3.601 - 1/27/26
|