Title:
|
RESO Confirm the Mayor’s Appt of James Carroll as Chief of the Right of Way & Stormwater Maintenance Div of the Dept of Public Works of the COJ Pursuant to Section 332.302, Ord Code; Waiving the Requirements that the Div Chief have a 4 Yr Degree from an Accredited College or University in Engineering, Construction or Construction Management & be Registered by the State of FL as a Professional Engineer (McCain) (Introduced by CP at the Req of Mayor) (Co-Sponsor CM R. Gaffney)
5/24/22 CO Introduced: R
6/7/22 R Read 2nd & Rerefer
6/14/22 CO Read 2nd & Rerefer: R
6/22/22 R Withdraw 4-0
6/28/22 CO Withdraw 17-0
|